Project Description

Sabiya Power & Water

Replacement of Turbine bypass System at Sabiya Power generation & Water Distillation Stations.

Brief

Existing Valve mounted in Sabiya Power Station is Hydraulic

  • Maintenance of the excising valve is difficult long time required for lapping the seat and Disc of more damage occurs the way only to change the valve which takes long time while the units
    stops and heavy loss of finical and production.

  • Hydraulic Oil, Pumps, Motors & Gases are used for operating of valve which is Hazardous for the unit and human. Oil & Pillage cause fire in high temperature area.

  • Maintenance of the excising valve is difficult long time required for lapping the seat and Disc of more damage occurs the way only to change the valve which takes long time while the units stops and heavy loss of finical and production.

  • Hydraulic Actuator have cylinder leaks and oil is spilled through insulation, smoke and fire occurs.

  • Existing valve control system is connected by separate unit implemented by Fisher Allen Brady. PLC Control system and then connected to D.C.S control system.