JO Wafra New Facility2019-03-05T15:06:51+03:00

Project Description

JO Wafra New Facility

Construction of New Operation & Emergency Lined Pits at JO Wafra.

Brief

  • Supply and Installation of 3 Centrifugal Pumps (3.3KV, 120KV) of Super Duplex material for Water and 2 Centrifugal Pumps for Oil.

  • Supply and Installation of 3 Water Disposal Trolley mounted trash pumps and 2 Water Disposal Trolley mounted trash pumps. Supply and Installation of Field instruments, Flow Meter, F&G Detection System, CCTV and 18 Km FOC cable Length.

  • Installation of New Power Control Room, 2Nos. Transformers, 1 No. Diesel Generator which will be supplied by JO.

  • Supply and Installation of Field Instruments like Radar Level Transmitters, Coriolis Flow Meters, Magnetic Flow Meter, Pressure Transmitters and Pressure Gauges.

  • Supply and Installation of H2S Systems which includes 2 controllers (Including 1 redundant Controller), marshalling cabinets, work station, printers, 35 Nos. H2S Gas Detector, 9 Nos. Sounders, 9 Nos. Beacons, 7 Nos. Manual Call Points and related cable from field instruments to marshalling cabinet of overall length of 6.9 Km.