Replacement of the 16″ Condensate Line with New 20″ Line from GCMB Manifold to MAA-02 Manifold for KOC.

Brief

  • Installation of 20″ Pipe with dual layer fusion bond epoxy coating from GCMB (Inside KOC) to MAA-02 outside KNPC 11.3 Km with the sectionalizing valve pit, pig launcher, jib crane and different types of valves (GOV, MOV & Manual Valves).

  • Supply and Installation of 12 Sets of Solar PV System of total capacity of 3.82 KW which includes Solar Panels, Ni-Cd Batteries, Charge Controller, Inverter, Data logger, PV Combiner, 12 Nos. AC – DC Distribution Boards, 3 Nos. 6KVA & 10KVA, 250/250VAC Dry Type Transformer.

  • Supply and installation of 7 Nos. of Remote Terminal Units (RTUs) with

  • PLDS system (Pipeline Leak Detection System for 11.3 Kms of pipeline)

  • GMIS System (Gas Management and Information System)

  • FOCS (Fiber Optic Communication System for all RTUs and 18 Kms of FO Cable route)

  • SCADA system for all RTUs

  • Supply and Installation of Field instruments, Flow Meter, F&G Detection System, CCTV and 18 Km FOC cable Length.