Doha WDC (P10)2019-02-28T11:55:20+03:00

Project Description

Doha WDC (P10)

Construction & Maintenance of 1200mm dia. D.I pipeline from Doha distillation plant to Doha WDC (P10), Chemical Building, Blending Chamber, Modification at Pumping station and associated works at Doha WDC (P10)

Brief

The contract scope of work comprises of the supply, construction, commissioning and maintenance of the 1200 mm dia. D.I pipeline from Doha distillation plant to Doha WDC (P10), Blending building piping, proposed pipeline from blending building to respective connections shown on the drawings inside Doha WDC and modification works for pipeline inside Doha WDC.