Project Description
JO Wafra New Facility
Construction of New Operation & Emergency Lined Pits at JO Wafra.
Brief
Supply and Installation of 3 Centrifugal Pumps (3.3KV, 120KV) of Super Duplex material for Water and 2 Centrifugal Pumps for Oil.
Supply and Installation of 3 Water Disposal Trolley mounted trash pumps and 2 Water Disposal Trolley mounted trash pumps. Supply and Installation of Field instruments, Flow Meter, F&G Detection System, CCTV and 18 Km FOC cable Length.
Installation of New Power Control Room, 2Nos. Transformers, 1 No. Diesel Generator which will be supplied by JO.
Supply and Installation of Field Instruments like Radar Level Transmitters, Coriolis Flow Meters, Magnetic Flow Meter, Pressure Transmitters and Pressure Gauges.
Supply and Installation of H2S Systems which includes 2 controllers (Including 1 redundant Controller), marshalling cabinets, work station, printers, 35 Nos. H2S Gas Detector, 9 Nos. Sounders, 9 Nos. Beacons, 7 Nos. Manual Call Points and related cable from field instruments to marshalling cabinet of overall length of 6.9 Km.